Saturday, December 22, 2007

Looking northeast at the front of the living room. All forms are in place, ready to pour. All window and door blockouts are covered by the outside forms. The 3' parapet wall, as well as the 4' and 8' overhangs are clearly shown.









West wall forms all in place, with parapet and 4' overhang. The temporary bracing is in place, to be removed when the concrete has set and the forms are removed. This can usually be done the day after the pour.

No comments: