Saturday, December 22, 2007

The trailer with the center form for the roof is inside the framed walls. Each room has a 9' opening to allow future removal of the trailer. This opening is framed in later as needed for windows, doors, or solid wall






The crew is attaching the wings on the ceiling center section prior to lifting (with a hydraulic piston on the trailer) the entire ceiling up into place and securing it to the top of the walls

No comments: