Saturday, February 9, 2008

The base of the large hdpe sleeve for the 22" Sun Dome. All penetrations to the roof are hand coated with a thick preliminary layer of sealant before the entire roof is sprayed.

The sleeve for the Sun Dome from the interior, showing the painted marking of the initial leak. When the roof is completely coated another water test will be done and any (hopefully none!) unsealed leaks will be marked with a different color paint and corrected.

No comments: