The subcontractor did such a bad job that they also covered completely over nearly all the drains with up to 3/4" of concrete. The drains all had to be chipped out and the drainage will need to be redone.
Saturday, February 9, 2008
The subcontractor did such a bad job that they also covered completely over nearly all the drains with up to 3/4" of concrete. The drains all had to be chipped out and the drainage will need to be redone.