Saturday, March 8, 2008


Moving dirt into place on top of the home with the tractor. It took several days and many truckloads of dirt to finish the job. The layer of 3/4" foam and the second layer 6 mil plastic are visible. There will be another 1-2 ft of dirt on top of them when finished. The surface will then be raked and seeded.

No comments: